# Berwick Apartments — Dunn Infrastructure Group

Relocation and upgrade of the storm drainage system at Berwick Apartments complex, including implementation of modern retention solutions and erosion control measures.

## Project details

- Type: Storm drainage & retention
- Location: Savannah, GA
- Client: GEIS
- Status: 2025

## Scope

- Relocation of main storm drainage outfall
- Reshaping of existing retention pond
- Implementation of erosion control measures
- Upgrade of existing drainage infrastructure

## Challenges

- Working in occupied residential area
- Managing existing storm dwater flow
- Coordinating with local municipality
- Meeting strict environmental regulations

## Solutions

- Implemented advanced dewatering systems
- Created detailed coordination schedule
- Applied best-in-class erosion control measures
- Created an effective drainage outfall to improve runoff

## Outcomes

- Improved storm water management
- Reduced flooding risks
- Enhanced property value
- Full environmental compliance achieved

---

Source: https://www.dunninfrastructuregroup.com/projects/berwick-apartments
Company: Dunn Infrastructure Group — +1-912-663-1365 — contact@dunninfrastructuregroup.com
Machine-readable index: https://www.dunninfrastructuregroup.com/llms.txt · API: https://www.dunninfrastructuregroup.com/openapi.json · Sitemap: https://www.dunninfrastructuregroup.com/sitemap.xml
