24/7 emergency(912) 663-1365
CallRequest a bid
CSX Intermodal: storm drainage work by Dunn Infrastructure Group
Storm drainage

CSX Intermodal

Storm drainage construction for a new CSX intermodal container yard in Savannah, including collection piping, drainage structures, and outfall work sized for the large impervious footprint of a container handling facility. Installation was sequenced around wetland protection requirements and inconsistent subgrade soils.

Location
Savannah, GA
Client
Treno
Status
Completed 2025
Scope
Storm drainage
01Scope of work

What we built

  1. 01Installation of storm drainage system
02Job report

What we ran into, and how we handled it.

1

Challenges

  • Managing wetland protection requirements
  • Managing inconsistent soils
  • Meeting aggressive project timeline
  • Ensuring system integration with existing infrastructure
2

Solutions

  • Seamless installation of storm drainage system
3

Outcomes

  • On time and on budget

Last updated: March 2, 2026