Quick Start: water, sewer, & storm work by Dunn Infrastructure Group
Water, sewer, & storm

Quick Start

Comprehensive utility infrastructure installation for the Quick Start development project in Pooler, Georgia. This project included water distribution, sanitary sewer, and storm drainage systems to support the commercial and residential development.

Location
Pooler, GA
Client
JW Oliver
Status
Completed 2025
Scope
Water, sewer, & storm
01Scope of work

What we built

  1. 01Installation of water distribution system
  2. 02Construction of sanitary sewer network
  3. 03Implementation of storm drainage system
  4. 04Installation of fire protection infrastructure
  5. 05Site preparation and utility coordination
  6. 06Integration with existing municipal systems
02Job report

What we ran into, and how we handled it.

1

Challenges

  • Coordinating with existing municipal infrastructure
  • Managing multiple utility system installations
  • Ensuring proper system integration
  • Meeting development timeline requirements
  • Coordinating with local utility authorities
2

Solutions

  • Implemented strategic phasing of utility installations
  • Utilized advanced construction scheduling
  • Coordinated closely with local utility authorities
  • Applied comprehensive quality control measures
  • Designed systems for seamless municipal integration
3

Outcomes

  • Successfully completed on schedule
  • All utility systems fully operational
  • Seamless integration with municipal infrastructure
  • Enhanced local development capabilities
  • Positive impact on Pooler area development

Last updated: March 2, 2026